Nuclear Astrophysics at ISAC with DRAGON, The DRAGON Facility: Installation Status, Commissioning Plans and Beam Time Requests

This brief report provides a summary of the status of the construction, installation and planned commissioning of the DRAGON facility. A brief summary of the first planned experiments, E824 [Measurement of the.... rate of the 21Na(p,γ)22Mg reaction], E811 [A..study..19Ne(p,γ)20Na reaction] and a new proposal, a study of the 20Na(p,γ)21Mg reaction, is also included. Additional beam shifts are requested for E824.
Journal:
