'

The DRAGON Facility at TRIUMF-ISAC: Installation Status and Commissioning Plans

Science

 

This report provides a status report of the construction and installation of the DRAGON facility and as well provides information on what is required in terms of both stable and radioactive beams for the commissioning of DRAGON and the first planned experiment, E824, the study of 21Na(p,γ)22Mg reaction. Assuming a 21Na beam intensity of 1010/s, 54 beam shifts are requested for this study.

Author: D'Auria, J. M.
Journal: EEC Report